Concept rendering of a Lux Mesa charging stop on the southbound I-35 frontage road at Bruceville-Eddy: charging canopies, solar carports, a coffee building and a landscaped courtyard beside I-35

Lux Mesa · Potential site · Bruceville-Eddy, Texas

Bruceville-Eddy

An early concept for a solar-powered fast-charging stop on the southbound I-35 frontage road at Bruceville-Eddy: shade, a garden, clean private restrooms and good coffee.

POTENTIAL SITE · UNDER STUDY EXPLORE IN 3D
8 → 28DC fast-charging stalls, opening to full build-out
499 kWof solar on canopies, carports and ground rows
Up to 1 MWhof on-site battery storage
2 padsfor a coffee shop and a second shop
8.8 acresdesigned around the driver, not the pump

Powered by the panels overhead

More sun in every charge.

A Lux Mesa stop here would make its own power. Solar panels on the charging canopies, the courtyard carports and the ground rows feed the station directly, a battery smooths out the peaks, and the grid fills in the rest.

59%of the station's energy would come from on-site solar in its first full year, with 8 chargers open.1
~800megawatt-hours of solar energy put to work every year once the array is fully used, about what 59 Texas homes use in a year.2
19%of the station's energy still comes from the sun when all 28 stalls are busy, and 25% over the first twenty years.1

Share of station energy supplied by on-site solar

Estimated, by year of operation. The array stays the same size while charging grows from 8 to 28 stalls, so solar's share settles near 19%.

Show the numbers
YearStallsSolar used (MWh)Solar share

The carbon math

Cleaner than the grid. Far cleaner than the pump.

Every kilowatt-hour the panels supply is one the station doesn't buy from the Texas grid. Here's what that would add up to, compared with an identical station running on grid power alone.3

266METRIC TONS CO₂e A YEAR

avoided once the station is fully built out, versus the same 28-stall stop running entirely on grid power.

58CARS' WORTH, EVERY YEAR

That's the annual emissions of about 58 typical gasoline cars, cancelled out by the panels alone.4

4,800METRIC TONS CO₂e, FIRST 20 YEARS

avoided over the station's first twenty years of operation, with no change in how drivers charge.

Annual CO₂ for the same ~13.7 million miles of driving

Gasoline cars (25 mpg)
4,880 t
EVs on a grid-only charger
1,380 t
EVs charging at Lux Mesa
1,110 t

At full build-out, drivers charging here would cut tailpipe-equivalent emissions by about 77% (roughly 3,800 tonnes a year) compared with driving the same miles on gasoline, and solar takes another 19% off what a grid-only charger would emit.5

The site concept

The Lux Mesa design, fitted to this site.

Every Lux Mesa stop uses the same plan: two shaded charging wings, a coffee shop with a drive-thru and patio, a private-stall restroom off a shaded courtyard, a garden with a lit walking loop and a fenced dog run, and solar over the parking, with warm, dark-sky lighting after sundown and security cameras over the chargers. Here is how it could sit on the southbound I-35 frontage road at Bruceville-Eddy.

OPEN THE 3D MODEL Spin it around, move the sun through the day and watch the stalls fill in as the station grows.

Concept renderings from the 3D model. Surroundings: map data © OpenStreetMap contributors; aerial photo and ground heights: USGS.

Concept rendering of the Lux Mesa charging canopy with cars at fast chargers

Fast, shaded charging

DC fast chargers under a solar canopy, built for any EV. Stalls are a generous 20 feet deep, so full-size pickups fit, and the station would grow from 8 to 28 stalls as demand does.

Concept rendering of the restroom courtyard between the solar carports, with the garden beyond

Private restrooms

Individual, fully enclosed stalls with a shared wash area, unlocked by a code that comes with your charging session, reached by a shaded walkway under the solar carports.

Concept rendering of the coffee building with a drive-thru and an outdoor patio with tables

Coffee and a patio

A coffee shop with a walk-up door, a drive-thru and an outdoor patio opening onto the garden. Grab a drink while the car charges.6

Renderings show the Lux Mesa design as planned for our first site, in Jarrell. All renderings and 3D views are conceptual.

Location

I-35 in Bruceville-Eddy.

A potential site on the southbound I-35 frontage road at Bruceville-Eddy, between Waco and Temple, in McLennan County.

  • 8 stalls in its first year, growing to 28 by about year 11 in our planning model
  • Status: under study; no opening date set
  • See the site in 3D

This is one of several locations along I-35 that Lux Mesa is looking at. It is not a committed site: the land, layout and numbers here are early planning estimates and may change or not go ahead.

Want a stop here?

Sign up for news on Lux Mesa stops across Texas, and tell us which sites you'd use.

KEEP ME POSTED

How we calculated this

  1. Solar share = grid energy the solar displaces ÷ total station energy, from Lux Mesa's hourly planning model run for this site (499 kWdc array, 250 kWh battery growing to 1 MWh, 8 stalls in the first year rising to 28). Charging losses of about 5% are included. Year 1 is the first full year of operation; no opening date is set.
  2. About 800 MWh a year of grid purchases displaced at full build-out (4.12 → 3.33 GWh/yr). Home comparison uses roughly 13,500 kWh a year per Texas household (about 1,130 kWh a month, EIA).
  3. Grid emissions use the U.S. EPA eGRID2023 average for the ERCOT region, 736.6 lb CO₂e per MWh (EPA eGRID summary tables). Texas's grid is getting cleaner each year, so savings in later years will likely be somewhat smaller than shown; displacing peak-hour gas generation (EPA's non-baseload rate is about 1,248 lb/MWh) would make them larger.
  4. Uses EPA's figure of about 4.6 metric tons of CO₂ per typical passenger vehicle per year (EPA Greenhouse Gas Equivalencies).
  5. At full build-out the station is modeled to deliver about 3.9 GWh a year. At 3.5 miles per kWh that is about 13.7 million EV miles. The gasoline comparison assumes 25 mpg and 8.887 kg CO₂ per gallon (EPA). EV figures count only electricity emissions; none of the comparisons include vehicle manufacturing.
  6. Coffee and second retail tenants would be sought later; none is signed. All renderings and 3D views are conceptual, and figures are pre-construction planning estimates that will change if the site goes ahead.